Changes

Jump to navigation Jump to search
→‎Redispatch 2.0: and CLS / smart meter
#Objectives The primary objectives of Redispatch 2.0 are to improve grid stability, increase the efficiency of grid operations, and facilitate the integration of renewable energy into the electricity system. It aims to achieve these objectives while minimizing the overall cost to consumers and ensuring fair and transparent market practices.
Redispatch 2.0 represents a comprehensive framework for modernizing grid management practices and adapting to the changing dynamics of the energy market in Germany. It reflects the ongoing transition towards a more sustainable and flexible energy system driven by renewable energy and digital innovationand for this reason includes functions embedded into consumers smart meters.If frequency rises and conventional cut off of generated power is not sufficient, the transmission grid operator sends a message to the smart meter operator via the distribution grid operator and telling it to cut of the CLS (controllable local system) for consumer-side electric generators (photovoltaik, wind, gas). Similar things happens with sinking frequencies from a higher demmand exceeding available conventinal energy reserves. In this case the smart meter gateway shuts down the CLSs assiciated with high enegy consuming devices (wallbox, heat-pumps...)
=Chapter 4 Energy Suppliers / Retailers=
=Chapter 5 Energy Generation / Powerplants=
=Chapter 6 Energy Import /Export in the EU and Worldwide=
113

edits

Navigation menu